Showing posts with label caulking. Show all posts
Showing posts with label caulking. Show all posts

Monday, November 16, 2009

November morning at Burnham Boatbuilding



November morning at Burnham Boatbuilding (above) and Daisy the dog trying to keep up with Harold

The weather couldn't be better for a boatbuilder - especially as Harold is caulking the yawl "Sawdust" inside the barn..but the barn door is open and it is still warm enough to keep it that way. The sound of a caulking mallet in an Essex shipyard is probably a familiar one to generations before us but less so now. It is one that a trained ear can distinguish very clearly from the sound of hammers and nails. It is a sound all of its own.